Skip to content

Section 2: PRO R&P Drive Installation

rp_029

Section Note

Installation is shown using PRO CNC machine risers. You're specific application may differ.


Parts and Tools Required

The following parts and tools will be used in Section 2

QTY Part/Description
1 CRP320-00-TEN-19.1
(1) R&P Tension Post
(1) R&P Tension Bracket
(1) M6 x 12mm Flat Head Screw
(1) M8 x 14mm Hex Cap Screw
(1) M8 x 90mm Hex Cap Screw
(2) M8 Flat Washer
(1) Die Spring
1 CRP320-00-FAST-XXX
(1) Eccentric Collar Bearing Cap
(1) Pivot Shaft

2.1 Drive Installation

2.1.1

rp_030
  • Attach the tension post to the R&P plate as indicated.
  • Partially tighten the fastener.

2.1.2

rp_031
  • Attach the tension bracket to the riser plate as indicated.
  • Partially tighten the fastener.

2.1.3

rp_032
  • Attach the R&P assembly to the riser plate as indicated.

Assembly Note

Ensure the eccentric collar bearing cap is oriented correctly. It will fit over the eccentric collar bearing pre-installed in the R&P drive plate.


2.1.4

rp_043
  • Ensure the R&P assembly is fully seated on the riser plate as indicated.

2.1.5

rp_033
  • Fully tighten the pivot shaft.

Assembly Note

There will be a gap between the head of the pivot shaft and the eccentric collar bearing, as shown by the arrow.


2.1.6

rp_034
  • While pushing in on the eccentric collar bearing, rotate it in the clockwise direction until it starts rotating inside the R&P plate.
  • Hold the eccentric collar bearing in this position while proceeding to the next step.

2.1.7

rp_035
  • Tighten the set screw on the side of the eccentric collar bearing.

2.1.8

rp_036
  • Install the tension bolt, washers, and spring as indicated.

Assembly Note

Only thread the bolt through the first hole of the tension post.


2.1.9

rp_037
  • Tighten the tension post fastener

2.1.10

rp_038
  • Continue threading in the tension bolt until the spring is seated, but not compressed.
  • Fully tighten the tension bracket fastener.

2.1.11

rp_044
  • Tighten the tension bolt 3 revolutions to tension the R&P Assembly.